Work Method Statements
Metal Door Frames Work Method Statement
The Metal Door Frames Safe Work Method Statement (SWMS) is a comprehensive 16 page procedure. This SWMS covers the modification and installation of metal door frames.
The Metal Door Frames procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Metal Door Frames Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational Inspection
- Operation
- Clean-up & Maintenance
- Emergency Procedures
- References
Product Details:
- 16 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Planning
Liaise with Site Supervisor. Ensure following is provided before work commences:
- Site specific induction (include location of amenities, first aid facilities, emergency plans and evacuation points, incident reporting, communication, contact persons etc)
- Health and Safety Rules for site
- Supervisory arrangements
- PPE requirements for site (hard hat, high visibility clothing, safety boots, etc)
- Types of hazards at site
- Site plans – showing no go zones for pedestrians
- Traffic Management plans
- Relevant SWMS and JSA’s
- Site security requirements
Note: Do not work in No Go Zones of electrical power-lines unless de-energised/isolated and evidence of the continuing isolation of the power supply is obtained.
Ensure all persons entering construction site have a Construction Induction Card (or equivalent).
Ensure suitable Material Safety Data Sheets (MSDS) are obtained for shielding gas used (and other chemicals as relevant)
Note: MSDS must be obtained from the manufacturer and issued within the last 5 years.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.