Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Jackhammer- petrol Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

Jackhammer- petrol Safe Work Method Statement

The Jackhammer- petrol Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure. This SWMS covers the use of a petrol-powered Jackhammer.

The Petrol Jackhammer Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Jackhammer- petrol Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 11 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery
Related Products:

Pre-operational Inspection:

Conduct visual inspection. Ensure:

  • Throttle trigger moves freely and springs back to idle
  • Drill bit correct for job, secure with no missing/loose nuts, screws
  • Drill bit / chuck not cracked, bent, or warped
  • Muffler shell undamaged
  • Handle/grips undamaged and free of oil/dirt
  • Guards in place and undamaged
  • Unit clean and free of dust/dirt etc
  • No fuel leaks
  • Anti-vibration (AV) system in place
  • Fuel stored in suitable containers

PPE:

Earmuffs:

  • No hardness, cracks on ear-cups
  • Replace cushions after 6-8 months. If used in extreme climates – replace after 3-4 months.

Respiratory Protection:

  • Suitable for contaminant
  • Proper fit (no facial hair, fit for individual)
  • Worn correctly
  • All pieces inspected, no damage

Gloves:

  • Vibration-insulation

Safety Glasses

  • Side protection panels in place
  • Clean and free of cracks or visibility obstructions

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.