Work Method Statements
Jackhammer-Electric Work Method Statement
The Jackhammer-Electric Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure. This SWMS covers the use of an electrically-powered Jackhammer.
The Jackhammer-Electric Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Jackhammer-Electric Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Jackhammer-Electric includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational Inspection
- Operation
- Maintenance
- Emergency Procedures
- References
Product Details:
- 11 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Related Products:
Pre-operational Inspection:
Conduct visual inspection. Ensure:
- Throttle trigger moves freely and springs back to idle
- Drill bit correct for job, secure with no missing/loose nuts, screws
- Drill bit / chuck not cracked, bent, or warped
- Handle/grips undamaged and free of oil/dirt
- Guards in place and undamaged
- Unit clean and free of dust/dirt etc
- Anti-vibration (AV) system in place
- Electric lead attached securely, no exposed wires or damage along entire length, including plug
- RCD protection used
Earmuffs:
- No hardness, cracks on ear-cups
- Replace cushions after 6-8 months. If used in extreme climates – replace after 3-4 months.
Respiratory Protection:
- Suitable for contaminant
- Proper fit (no facial hair, fit for individual)
- Worn correctly
- All pieces inspected, do damage
Gloves:
- Vibration-insulation
Safety Glasses
- Side protection panels in place
- Clean and free of cracks or visibility obstructions
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.