Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Hydro Evacuation Truck Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Hydro Evacuation Truck Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure.

Preliminary discussions are to be held prior to the commencement of the activity to ensure that all work related hazards have been identified and suitable risk control strategies have been implemented. Consider traffic obstructions, pedestrian interaction, weather conditions, overhead obstructions (power- lines, phone cables, overhanging branches) and confined space entry. Where a hazard exists and risk control measures are not suitable, clarification should be sought from Head Office or the relevant Client Contact

The Hydro Evacuation Truck procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Hydro Evacuation Truck Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Operator Requirements
  • Transporting Equipment to Site
  • Job Preparation
  • Site Set-up
  • Final Pre-work Checks
  • Operation
  • On Completion
  • References

Product Details:

  • 10 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Job Preparation

Check that all applicable safety equipment is available and in safe working condition including:

  • Applicable PPE
  • Traffic control devices & tools
  • Confined space entry equipment including tripod, harness, oxygen meter

Pre-inspect all equipment ensuring that:

  • Everything is in safe working order (chains, slings, lifters)
  • Oxygen meter is fully functional
  • Applicable to the work being performed

Visually check the work area for:

  • Overhead obstructions (power-lines, branches)
  • The most suitable position to locate truck.
  • Pedestrian & vehicle movement

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.