Work Method Statements
Front End Loader - Fertilizer Spreader Attachment Work Method Statement
The Front End Loader - Fertilizer Spreader Attachment Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure which covers the use of a Front end loader with a fertilizer spreader attached.
The Front End Loader - Fertilizer Spreader attachment procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Front End Loader - Fertilizer Spreader attachment Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Pre start checks
- Transport
- Operation
- Completion
- Maintenance
- Emergency Procedures
Product Details:
- 12 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Inspect Loader
Ensure:
- No fluid leaks
- Hoses/couplings not cracked/split
- Operator controls labelled
- Safety decals in place and legible
- Flashing lights/reversing beepers functioning (if installed)
- Rear-view mirrors are present, functional and adjusted correctly
- Cabin windows are clean and undamaged (if present)
- Work lighting sufficient and functional
- SWL displayed (where required)
- ROPS installed (where required)
- Tyres are undamaged, even pressure.
- Spreader attachment compatible
- Locking pins/clips for spreader attachments are available and undamaged
- All safety guards are in place and undamaged
- Seatbelt present and in good condition.
- Fire extinguisher present and secured
- No debris, oil or tools present on deck, walkway or steps.
- All stored items in cabin are secured.
Do not use if any fault/damage/missing parts. Report immediately and follow tag-out/lock-out procedures.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.