Work Method Statements
Fire Door Installation Work Method Statement
The Fire Door Installation Safe Work Method Statement (SWMS) is a comprehensive 15 page procedure. This SWMS covers general aspects of fire door installation in residential and commercial buildings. This does not cover physical testing of fire doors or work from heights (above 2m). A dedicated SWMS must be developed for door installation above 2m.
The Fire Door Installation Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Fire Door Installation Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Fire Door Installation includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational Inspection
- Operation
- Emergency Procedures
- References
Product Details:
- 15 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Related Products:
Planning:
Liaise with Principal Contractor. Ensure following is provided before work commences:
- Site specific induction (include location of amenities, first aid facilities, emergency plans and evacuation points, incident reporting, communication, contact persons etc)
- Health and Safety Rules for site
- Supervisory arrangements
- PPE requirements for site (hard hat, high visibility clothing, safety boots, etc)
- Types of hazards at site
- Site plans – showing no go zones for pedestrians
- Traffic Management plans
- Relevant SWMS and JSA's
- Site security requirements
Ensure all persons entering construction site have a Construction Induction Card (or equivalent).
Ensure door, frame materials and hardware comply with relevant Australian Standards and Building Code of Australia
A metal tag (approx 50mm x 25mm) should be attached securely to door and display the following information clearly:
- Compliance with AS
- Fire Rating Level (FRL) (eg: -/160/30)
- Manufacturers name and contact information
- Door Tag number
- Year of Manufacture
Instructions must be given to ensure tag is not painted over
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.