Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Drivers Manual

Back   Buy Now $195 ex GST

Drivers Manual

This 20 page Driver Manual has been developed to provide guidance and information for drivers to assist in the prevention of injury or illness.

Road accidents are the cause of most fatalities in the road transport industry, and driver fatigue is often a factor. Workers have also been killed or seriously injured after falling from the top of their trucks while loading, checking or securing goods. More than 80% of severe injuries among road transport workers, however, are sustained while not driving. Most of these injuries are the result of manual handling, slips, trips and falls and being injured during loading/unloading practices involving forklifts.

Driver Manual is suitable for:

  • Heavy Vehicle Drivers
  • Courier Drivers
  • Truck Drivers
  • Delivery Drivers
  • Professional Drivers

This Drivers Manual contains:

  • Welcome letter
  • Important contacts

Administrative Procedures:

  • Induction
  • Training
  • Code of conduct
  • Reporting procedures
  • Mobile phones
  • Seatbelts
  • Licenses
  • Work diaries & documentation
  • Fueling

Occupational Health & Safety:

  • Entering/exiting vehicle
  • Low risk driving
  • Maintenance of vehicle
  • Housekeeping
  • Smoking
  • Vehicle accident or breakdown
  • Incident/injury reporting
  • Dangerous goods

Occupational Health & Safety Policies:

  • OHS policy
  • Safe driving plans policy
  • Drugs & alcohol policy
  • Fatigue management policy
  • Falls from height (above 2 metres) policy
  • Manual handling policy
  • Pre-operation inspection policy & checklist
  • Employee policy agreement

Product Details:

  • 20 Page Document
  • Written by ex WHS inspectors
  • Referenced
  • MS Word format NOT PDF
  • Employee sign off section
  • Instant download delivery
Related Products:

Back   Buy Now $195 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.