Confined Spaces Safe Work Procedure or Work Method Statement

Confined Spaces work has inherient dangers and this four page Safe Work Procedure or Work Method Statement is a vital part of a safe work system.

The Confined Spaces Safety Procedure Includes:

  • Confined Spaces Qualifications
  • Types of Confined Spaces
  • Safety Equipment
  • Risk Assessment
  • Air Quality Standards
  • Standby Person
  • Entrapment
  • Suffocation
  • Emergency Procedures
  • 4 Page Complete Procedure
  • MS Word Format
  • Ready to Use
  • Version 4.0

 

SWP_Sample

 

Back      Buy Now $79.95 ex GST

 

Confined_Spaces_Safety

Confined_Spaces_Procedure

Confined_Spaces

 

Working In Confined Spaces Safety Notes

Before Entering Confined Spaces Consider

  • Are there any unusual or specific hazards associated with the confined space  work, such as other workers or working with heat (welding)?
  • Are there any site occupancy restrictions and conditions, including access and egress, work schedules and emergency management arrangements, including emergency communication and evacuation plans?
  • Prior to any work-taking place in the confined space, the space must be naturally ventilated for a minimum period of ten minutes. If satisfactory atmospheric levels are not obtained then forced ventilation must be used until satisfactory gas test results are achieved.
  • Prior to any entry taking place, the atmosphere of the confined space must be tested to comply with the following.
        • Oxygen >19.5% by volume and <23.5% by volume
        • Flammable gas <5% by   volume
        • Hydrogen Sulphide <10 ppm • Carbon Monoxide <30 ppm
  • Confined space signage and barricading is applied at the entry site prior to entering

While Working In Confined Spaces

  • Maintain communication with other fellow workers and the stand-by person
  • Alert the stand-by person of any hazards
  • Understand the rescue and work procedures prior to entrance
  • Exit the confined space quickly when required

When Developing a Confined Spaces Safety Program Consider:

  • Advice on how to identify confined spaces.
  • The identification and assessment of all potential hazards that may exist at the beginning of the work as well as those that may develop because of the work activities.
  • A plan to eliminate or control all identified hazards.
  • Training program for all the workers that will enter into the confined spaces.
  • The establishment of an entry permit system for each entry into a confined space.
  • Development of an emergency plan complete with training and equipment in case an unforeseen situation occurs.
  • An emergency response system.
  • Program review whenever there is a change in circumstances or at least annually, to identify program weaknesses and make any necessary changes to the program.

 