Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Concrete Joining, Sealing & Curing Work Method Statement/Work Procedure

Concrete Joining, Sealing and Curing Safe Work Method Statement:

The Concrete Joining, Sealing and Curing Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure outlining the safety steps for joining, sealing and curing concrete.

The Concrete Joining, Sealing and Curing procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overal OHS System. The Concrete Joining, Sealing and Curing procedure can be used as part of yourOHS inductions, for Tool box talks or tender applications.

First Aid/Emergency Procedures :

Follow MSDS for First Aid instructions. If operator exposed, take MSDS with patient to Doctor. Develop and implement an emergency response plan for the site. Include

  • Assembly points
  • Communication
  • Responsible persons
  • Emergency contacts (including nearest medical facility)

References :

OHS Legislation in all States

MSDS Selley’s – Wet Area Silicone Sealant (2004)

QC Solvent-based Sealers (Spray-Applied) – QC Construction Products – Information Bulletin (2008)

WorkSafe Victoria – Prevention of falls in General Construction (2006)

WorkSafe Victoria – Code of Practice – Manual Handling

AS/NZS 1716:2003 Respiratory protective device

AS3000 Wiring Rules

AS/NZS 2340 – Classification of Hazardous Areas

AS 2381.1 – Electrical equipment for Explosive Atmospheres

Workcover NSW – Safety Alert – Moving Plant on Construction Sites

Concrete Joining, Sealing and Curing Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • Completion
  • First Aid/Emergency Procedures
  • References
  • 8 page procedure

  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific