Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Chainsaw Safe Work Procedure or Work Method Statement

 

SWP_Sample

Back      Buy Now $79.95 plus GST

 

 

Having a Safe Work Procedure or Work Method Satement for anyone operating a Chain Saw is imperative. The Safety Procedure provides straight forward instructions for operating chainsaws safely.

Procedure is in MSWord format, ready for printing and laminating for easy access wherever chainsaws are stored and used.

 

The Chainsaw Safe Work Procedure Includes:

  • Personal Protective Equipment (PPE)
  • Risk Assessment
  • Pre-Start Checks
  • Starting Procedure
  • Refuelling
  • Chain Saw Operation
  • Job Completion and more
  • 2 Page Complete Procedure
  • MS Word Format
  • Ready to Use
  • Version 4.0

 

Chainsaw Safety

Chain Saw

Chain Saw Safety Notes:

  • At least 2 personnel must be on site when a chainsaws is in use.
  • When operating chainsaw, be aware of the stress of the item being cut.
  • Pinching may result on compression side & sudden break may result on tension side.
  • Do not use any faulty equipment.

Before Use

  • Chain tension. Adjust if necessary.
  • Chain brake is working.
  • That the chain is sharp.
  • That the handles are dry, clean and free from oil or fuel mixtures.

Chainsaw Refuelling

  • Allow at least two minutes for the saw to cool down prior to re-fuelling.
  • Avoid spilling fuel or oil. Spilled fuel must be immediately cleaned up.
  • Move the chainsaw at least 3 metres from the fuelling point before starting the engine.

Before Cutting:

  • Identify any work that might require cutting above shoulder height.
  • Check for any metal objects that may be embedded.
  • Identify a safe method of work.

    To Purchase The Complete, Ready To Use Safety Procedure, Choose The Buy Now Option Below