Cement Mixer Usage Safe Work Procedure or Work Method Statement

The eight page Safe Work Procedure outlines the Safety Steps required to Use a Cement Mixer Safely.

This Procedure or Work Method Statement has been developed for employers to be able to give direct instructions on how to Use a Cement Mixer safely. The document can be used as part of an Induction Process, submitted with a tender or simply implemented into your existing OHS System.

The Procedure includes:

  • Personal Qualifications and Experience
  • Transporting
  • Site Awareness
  • Preparation
  • Pre-Start Daily Checks
  • Operation
  • On Completion
  • General Maintenance

SWMS Sample

The Safety Procedure is in MSWord Format for unlimited printing and use. The Procedure will be emailed directly to you.

Back  Buy Now $79.95 plus GST

Additional Safety Information for Using a Cement Mixer

When Using a Cement Mixer:

  • Never tow the mixer behind a vehicle.
  • Ensure the mixer is kept away from rain and water.
  • Ensure the area the mixer is being used is Level, Firm, and Free from obstructions.
  • Confirm that the mixer has been tested and tagged accordingly for electrical safety.
  • Always ensure on completion the mixer and drum are washed clean.