Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Carpet Tiles Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Carpet Tiles Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure. This SWMS covers installation of carpet tiles in new and existing premises. Tiles include backed/un-backed, fixed/unfixed, wool, synthetic and combination fibres, pile, needle-punch, tufted, woven etc. Also includes self-adhesive tiles and application of carpet adhesive for tiles without self-adhesive backing.

The Carpet Tiles Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Carpet Tiles Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Carpet Tiles includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 13 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Products:

Preparation:

Inspect work area. Ensure:

  • No tripping hazards
  • Clear of hazardous works in close proximity – especially hot works (grinding, welding etc)
  • Sufficient lighting
  • Adequate ventilation (use mechanical extraction if required)
  • Clear of non-essential persons (barricades and signage in place as required)
  • Clear of ignition sources if adhesive flammable

Note: Ignition sources include pilot lights, stoves, heaters, cigarettes, matches/lighters, grinding, welding, power points, lighting, light switches, radio transmitters, mobile phones, battery powered forklifts etc.

Storing Adhesive:

  • Ensure packages are stored within manufacturer's recommendations
  • Polyethylene container (as provided by manufacturer)
  • Ensure adequate spill containment is provided (eg bunded pallets for packages if required)
  • Store in a cool, well ventilated area
  • Store away from ignition sources
  • Store clear of incompatibles and food stuffs
  • Check containers regularly for leaks

Ensure spill containment kit available at site. Include:

  • Impervious gloves and safety goggles
  • Trowel, scraper and access to plenty of water

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.