Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Carpet Laying Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

Carpet Laying Safe Work Method Statement

The Carpet Laying Safe Work Procedure has been developed for employers to implement a site and company safety procedure for employees and contractors to use safely.

The Carpet Laying Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for Carpet Laying.

The Carpet Laying procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Carpet Laying procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • Risk Assessment
  • Site Awareness
  • Pre-Start Checks
  • Hand Tools
  • Operators Requirements
  • Installation
  • Personal Protective Equipment
  • Carrying Carpet
  • And much more
  • Risk Ratings

Product Details:

  • 10 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery
Related Products:

Carpet Laying Safety Notes

Airing the rooms after carpet has been laid is recommended. Any volatile organic compounds caught in the carpet during manufacture will dissipate within a few days.

Carpet laying can be hard on both your knees and your back. Correct manual handling and frequent stretching should be observed.

Existing damage: Identify and document any damage to the building or contents to prevent future conflict. Digital cameras are ideal for this task.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.