Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Carpet Cleaning Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

Carpet Cleaning Safe Work Method Statement

The Carpet Cleaning Safe Work Method Statement (SWMS) is a comprehensive 15 page procedure. This SWMS concerns the task of carpet cleaning, including the use of a steam cleaner machine and spot stain removal.

The Carpet Cleaning procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Carpet Cleaning Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 15 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery
Related Products:

Operation

Assess suitable travel pathway to enter/exit premises when carrying materials.

Check for stairs, stored items, corners or other obstructions that could cause tripping, crushing of fingers, or awkward postures when carrying equipment

Remove furniture, non-essential items and any debris from room to be cleaned. Do not handle broken glass directly. Use dust pan and brush to collect broken glass, wear gloves and dispose in safe manner.

When using team lifts, they must be co-ordinated and practiced. Ensure adequate communication and continue to check for obstacles during transport. Move slowly with shortest travel path.

If items cannot be removed, cover with plastic to avoid damage.

Ensure persons and pets are removed from area.

Vacuum carpet thoroughly.

Pre-treat stains as required. Spray directly onto carpet in close proximity to floor surface (avoid unnecessary spraying into air).

Wear hearing protection if required.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.