Building Site - Final Clean Up Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The five page Building Site Final Clean Up Procedure is developed for building cleaners who are performing the final building site clean up.

The Procedure is supplied in MSWord Format for inserting your company logo and is ready for printing or incorporating into your OHS System. This is not a template, it is a complete Safety Procedure ready for use.

The Safety Procedure includes:

  • Personal Protection
  • Pre-start check
  • Working on Ladders
  • Dust Control
  • Hazardous Substances
  • And more...

Product Details:

  • 4 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

Safety Notes:

All staff should be trained in the safe use of:

  • Chemicals – cleaning products
  • Electrical equipment – Vacuum cleaners, polishers, ladders.
  • Site safety including the safety of others. Example: People not to walk over wet floors
  • Manual handling.

Construction Site Clean Up Should Include:

Builders Rubbish

  • All builders rubbish, if any, to be removed from the area.
    (Example: Carpet, electrical cable, kitchen off cuts)
  • All walls are to be brushed down.

Safety Signs

Should be placed in appropriate places to alert others of possible hazards.

  • Cleaners at work.
  • Caution – Wet Floor.