Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Battery Charging Safe Work Procedure or Work Method Statement

The 2 page Safe Work Procedure outlines the Safety Steps required to operate a Lead Acid Battery Charger.

Lead Acid Battery Chargers need to be used with caution and appropiate safety procedures. The Lead Acid Battery Charger procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

The Procedure includes:

  • Planning
  • Preparation
  • Pre-start Checks
  • Removing From Plant
  • Charging
  • Completion
  • Replacing in Plant

Weed_Spray

Back  Buy Now $79.95 plus GST

Lead Acid Battery Charger Safety Notes

When Operating A Lead Acid Battery Charger:

  • Check the maximum number of cells that can be charged at once.
  • Clean battery terminals.
  • Replace filler caps loosely
  • Switch off charger before disconnecting
  • Confirm all electrical accessories are turned off before disconnecting the battery.
Back  Buy Now $79.95 plus GST