Work Method Statements
Air Conditioner Installation Work Method Statement
The Air Conditioner Installation Safe Work Method Statement (SWMS) covers risks associated with the general installation of air conditioning systems. Ensure the manufacturer's installation manual/guide is available for specific information on all installation works.
The Air Conditioner Installation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Air Conditioner Installation procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational inspection
- Installation
- Emergency Procedures
- References
Product Details:
- 6 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
Installation Refrigerant Gases:
- Ensure restrained adequately on transport vehicle.
- Avoid storing inside cabin of vehicles
- Keep minimum quantities
- Ensure Material Safety Data Sheet available (within 5 year issue date)
- Inspect cylinders regularly to ensure no damage or leaks
- Ensure adequate ventilation
Air Conditioner Installation Risk Assessment Notes
Ensure system designed by suitably qualified persons. Assess installation site. Check:
- Anchor points (suitable work load and position)
- Proximity to power lines
- Type of roof (pitched, tile, sky lights etc)
- Condition of roof (fragile, brittle etc)
- Presence of hazardous materials such as asbestos, lead, silica etc)
- Load bearing capacity of support walls, ceiling, roof
- Height of work area
- Access for equipment and materials
- Number of persons expected on roof/ceiling space
- Power supply
- Location of existing services (heating, water, pipes, electrical leads)
- Traffic Management requirements
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.