Work Method Statements
Air Compressor (Portable) Work Method Statement
The Air Compressor Safe Work Method Statement can be used onsite for staff training and OHS submission requirements.
The Safe Work Method Statement has been developed for principle contractors and employers to be able to give direct instructions on how to operate an Air Compressor safely.
The document can be used as part of an OHS Induction, submitted with a tender or simply implemented into your existing OHS System.
The Safety Procedure includes:
- Personal Protective Equipment
- Transporting
- Pre-start Checks
- Site Hazards
- Operating Compressor
- Personal Injury
- Oil Checks
- Compatiable Tools
- Pressure Settings
- Maintenance and more
Product Details:
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
High pressure air can cause serious injury. Never use compressed air for blowing dust off skin or clothing.
Correct operation of compressor, tools and attachments must be ensured.
Training should include:
- Safe Work Method Statements
- Fitting of personal protective equipment
- Manual handling
- Use of compressor and attachments
Review manufacturer’s operation manual before initial use.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.