Work Method Statements
  Construction
  Procedure Earth Moving
  Procedure Industrial
prcoedures
  Procedure Engineering
prcoedures
  Procedure Transport
prcoedures
  Procedure Food & Hospitality
prcoedures
  Procedure Landscaping & Gardening
prcoedures
  Procedure Office
prcoedures
  Procedure Mining
prcoedures
  Procedure Custom WMS

Concrete Vibrator Work Method Statement or Safe Work Procedure


Air Conditioner Installation

Air Conditioner Installation Safe Work Method Statement

Concrete Vibrator Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • Refueling
  • Maintenance
  • Emergency Procedures
  • References
  • 6 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Concrete Vibrator Safe Work Method Statement:

The Concrete Vibrator Safe Work Method Statement (SWMS) is a comprehensive 6 page procedure outlining the safety steps for operating a Petrol Driven Concrete Vibrator.

The Concrete Vibrator procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Concrete Vibrator procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Preparation

Inspect equipment. Ensure:

  • Unit is clean, free of oil, grease, concrete
  • Sufficient oil/petrol
  • No leaks
  • Guards in place and undamaged
  • Controls labelled and working
  • No missing screw/bolts
  • No cracked, broken or missing parts
  • No misalignment or binding of moving parts
  • Lock lever in place on cylindrical connector
  • Hoses/couplings/vibrator head secured adequately
  • Hoses undamaged, free of wear/tear
  • Vibrator head/hose assembly suitable for make/model of unit
  • Operator not fatigued or under influence of drugs/alcohol
  • Hair tied back, no loose clothing or jewellery
  • Operator able to handle vibratory force of unit


OHS Systems Work Method Statements (WMS) Safety Training OHS Auditing First Aid Kits

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
Safety Maintenance Log
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack

Construction WMS
Residential Construction
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits