Work Method Statements
  Construction
  Procedure Earth Moving
  Procedure Industrial
prcoedures
  Procedure Engineering
prcoedures
  Procedure Transport
prcoedures
  Procedure Food & Hospitality
prcoedures
  Procedure Landscaping & Gardening
prcoedures
  Procedure Office
prcoedures
  Procedure Mining
prcoedures
  Procedure Custom WMS

Explosive Power Tool (Fastening) Work Method Statement or Safe Work Procedure


Explosive Power Tool - Fastening

Explosive Power Tool - Fastening Safe Work Method Statement

Explosive Power Tool - Fastening Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Preparation
  • Pre-operational inspection
  • Loading
  • Operation
  • Misfire
  • Clean up and storage
  • Maintenance
  • Emergency Response
  • References
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Explosive Power Tool - Fastening Safe Work Method Statement:

The Powder Actuated (PA) Hand Held Fastening Tool Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for operating hand held explosive fastening tools. PA hand-held tools are used to drive a fastener (such as pin, stud or bolt) through building materials using explosive force derived from the detonation of a cartridge containing explosives.

They are extremely powerful and dangerous tools that can cause serious injuries and death. The Powder Actuated Fastening Tool procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Explosive Power Tool - Fastening procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Clean Up and Storage :

  • Ensure PA tool is unloaded
  • Clean tool. Use detergent oil and wire brush to remove dirt and carbon build-up.
  • Wear safety goggles.
  • Inspect for any damage. Remove from service if detected.
  • Place charges and tool in case and store in a locked/secured manner.

OHS Systems Work Method Statements (WMS) Safety Training OHS Auditing First Aid Kits

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
Safety Maintenance Log
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack

Construction WMS
Residential Construction
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits