Work Method Statements
  Construction
  Procedure Earth Moving
  Procedure Industrial
prcoedures
  Procedure Engineering
prcoedures
  Procedure Transport
prcoedures
  Procedure Food & Hospitality
prcoedures
  Procedure Landscaping & Gardening
prcoedures
  Procedure Office
prcoedures
  Procedure Mining
prcoedures
  Procedure Custom WMS

Electrical Wiring Low Voltage Work Method Statement or Safe Work Procedure


Electrical Wiring Low Voltage

Electrical Wiring Low Voltage Safe Work Method Statement

Electrical Wiring Low Voltage Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Set up
  • Operation
  • First Aid and Emergency Response
  • References
  • 6 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Electrical Wiring Low Voltage Safe Work Method Statement:

The General Electrical Wiring Safe Work Method Statement (SWMS) is a comprehensive 6 page procedure outlining the safety steps for low voltage Electrical Wiring. The General Electrical Wiring procedure is ready to use and is not a blank template.

This SWMS relates to low voltage, non-live electrical connection, equipment and installation works.The main hazards include: electrocution (fatality), electric shock, falls and asbestos in some switchboards. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Electrical Wiring Low Voltage procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Planning

Conduct an assessment of intended work site and develop a task specific SWMS.

Include :

  • Proximity to live electrical equipment
  • prospective fault levels
  • Site conditions
  • Weather conditions
  • Noise
  • Lighting
  • Spotters/safety observers
  • Permits
  • Proximity to vehicle/pedestrian traffic
  • Working environment (such as areas with reduced mobility – behind switchboards, roof spaces etc)
  • Working at heights, confined spaces etc
  • Possibility of inadvertent operation of equipment that is being worked on (LOTO procedures)
  • Disruption of services

OHS Systems Work Method Statements (WMS) Safety Training OHS Auditing First Aid Kits

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
Safety Maintenance Log
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack

Construction WMS
Residential Construction
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits