Air Conditioner Installation Safe Work
Method Statement:
The Air Conditioner Installation Safe Work Method
Statement (SWMS) is a comprehensive 6 page procedure outlining the steps
for the safe installation of air conditioner units.
This SWMS covers risks associated with the general
installation of air conditioning systems. Ensure the manufacturer’s
installation manual/guide is available for specific information on all
installation works.
The Air Conditioner Installation procedure is ready to
use and is not a blank template. Simply add your company details, ABN,
and include any site specific details or risks and make it specific to
the task at hand. It is then ready for printing and to be incorporated
as part of your overall OHS System.
The Air Conditioner Installation procedure can be used as
part of your OHS inductions, for Tool box talks or tender applications.
Preparation - Hazardous Materials:
- If cutting/drilling into structures, determine material type.
- Provide suitable personal protective equipment for short term works – example:
- Non-Friable Asbestos: Protective clothing, P1 or P2 half face mask (can be either disposable or cartridge)
- Silica: P1 or 2 half face with particle cartridge
Refrigerant Gases: Correct for type of system Cylinders labelled –
including weight, fill capacity, type and within test date Material
safety data sheets available. Ensure correct PPE for type/quantity.
- Eg: Ammonia: More than 900kg – impervious protective
clothing with Self Contained Breathing Apparatus (SCBA)– 25 mins
effective life
Group B2: less than 225kg – at least 1full face respirator with
appropriate cartridge Group B2: more than 225: 2 f/face respirators
Quantity of any type more than 900kg: SCBA
|