Work Method Statements
  Construction
  Procedure Earth Moving
  Procedure Industrial
prcoedures
  Procedure Engineering
prcoedures
  Procedure Transport
prcoedures
  Procedure Food & Hospitality
prcoedures
  Procedure Landscaping & Gardening
prcoedures
  Procedure Office
prcoedures
  Procedure Mining
prcoedures
  Procedure Custom WMS

Tree Felling Safe Work Method Statement

The ten page Safe Work Method Statement outlines the Safety Steps required when Tree Felling.

Tree Felling need to be used with caution and appropiate Safe Work Method Statements. The Tree Felling Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.

The Safe Work Method Statement includes:

  • Risk Assessment
  • Chainsaws
  • Climbing Trees
  • Ladders
  • EWP's
  • Using Tools in Trees
  • Felling Trees
  • Waste Removal
  • Emergencies

 

Weed_Spray

Back  Buy Now $79.95 plus GST

Tree Felling Safety Notes

Before Tree Felling:

  • A tree climber must be attached to the tree.
  • A ground worker must be in attendance.
  • Ladders must conform to the applicable provisions of AS 1892.
  • Equipment should be attached so no damage will be caused to the rope.
  • Timber under tention must be considered hazardous.

 

Back  Buy Now $79.95 plus GST