Pipe Laying (Coiled Pipe) Safe Work Method Statement

The six page Safe Work Method Statement outlines the Safety Steps required When Pipe Laying (Coiled Pipe) Safely.


Pipe Laying need to be used with caution and appropiate Safe Work Method Statements. The Pipe Laying (Coiled Pipe) Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.

 

Weed_Spray

Back  Buy Now $79.95 plus GST

The Safe Work Method Statement includes:

  • Employee Requirements
  • Transporting
  • Planning
  • Site Awareness
  • Preparation
  • Quality Control
  • Manual Handling
  • Operation
  • Site Safety (End Of Shift)

 

Pipe Laying (Coiled Pipe) Safety Notes

When Pipe Laying (Coiled Pipe):

  • Sand is to be placed in the trench by a backhoe.
  • Minimise waiting time for pipes on site prior to laying.
  • Place pipes in a secure compound “lay down” area when left unattended.
  • Check pipe for defects before laying into trench.
  • The coiled pipe should uncoil easily using the rigid pipe as a virtual axel.

 

Back  Buy Now $79.95 plus GST