Work Method Statements
  Construction
  Procedure Earth Moving
  Procedure Industrial
prcoedures
  Procedure Engineering
prcoedures
  Procedure Transport
prcoedures
  Procedure Food & Hospitality
prcoedures
  Procedure Landscaping & Gardening
prcoedures
  Procedure Office
prcoedures
  Procedure Mining
prcoedures
  Procedure Custom WMS

Overhead Crane Safe Work Method Statement


The eight page Safe Work Method Statement outlines the Safety Steps required to operate a Motor Grader Safely.


The five page Safe Work Method Statement outlines the Safety Steps required to operate an Overhead Crane Safely.

Overhead Cranes need to be used with caution and appropiate Safe Work Method Statements. The Overhead Crane Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.

The Safe Work Method Statement includes:

  • Risk Assessment
  • Operators Requirements
  • Planning
  • Daily Pre-Start Checks
  • General Safety Requirements
  • Preparation
  • Operation
  • On Completion

 

Weed_Spray

Back  Buy Now $79.95 plus GST

 

Overhead Crane Safety Notes

Before Operating An Overhead Crane:

  • No person shall operated the crane unless they are trained to do so.
  • Locate the power disconnection switch, always ensure the access to the switch is not blocked.
  • Operators must inspect all equipment daily before use.
  • Ensure the rated load capacity of the crane, hoist, chain, cable, slings, or other components will not be exceeded.
  • Personnel are to, and will remain clear of the load at all times.

 

Back  Buy Now $79.95 plus GST