Gantry Crane Work Method Statement (WMS)

Ganrty Cranes have inherient dangers and this completed Work Method Statement is a vital part of a safe work system.


The Work Method Statement Includes:

  • Site Awareness
  • Safety Equipment
  • Using Hooks
  • Wire Rope
  • Lifting Equipment
  • General Use
  • Using Control Switches
  • Suspended Loads
  • Lockout Tags
  • After Use Safe Work Method Statements
  • Power Loss
  • Complete Work Method Statement
  • MS Word Format
  • Version 4.0

 

Gantry-Crane-Work-Method-Statement

Gantry Crane Safety Notes

General Use

  • Personnel are and will remain clear of the loads at all times.
  • The load will not be suspended over personnel at any time.
  • Under no circumstances may anyone ride the hook or load. Injuries have occurred under these circumstances.

 

When Using Gantry Cranes Always

Ensure that;

  • The rated load capacity of the crane, hoist, chain, cable, slings, or other components WILL NOT be exceeded.
  • The hoist rope is not wrapped around the load.
  • Slings, load chains and other lifting devices are securely seated on the hook. (No twist that could cause the load to swing.)
  • The hoist is located directly above the load to be lifted.
  • The load is properly secured and balanced. This can be checked as the load is lifted slightly. Reposition the sling if required.

General Gantry Safety Continued

  • Raise the load sufficiently to clear any obstructions. A minimum clearance of 500 mm should be sufficient.
  • Do not push or pull on the load. The load should hang vertically below the hoist at all times.
  • Position the hoist directly above where the load is to be placed.
Back  Buy Now $79.95 plus GST

OHS Systems Work Method Statements (WMS) Safety Training OHS Auditing First Aid Kits

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
Safety Maintenance Log
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack

Construction WMS
Residential Construction
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits