Concrete Pumping With Truck Mounted Placing Boom Safe Work Method Statement

The eight page Safe Work Method Statement outlines the Safety Steps required to operate a Concrete Pump with Truck Mounted Placing Boom Safely.

Concrete Pumping needs to be used with caution and appropiate Safe Work Method Statements. The Concrete Pumping Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.


The Safe Work Method Statement includes:

  • Site Awareness
  • Suitable Location
  • Boom Set-Up
  • Delivery Pipeline Set-Up
  • Pre-Start Daily Checks
  • Concrete Delivery
  • Pumping
  • On Completion

 

Weed_Spray

Back  Buy Now $79.95 plus GST

Concrete Pumping Safety Notes

When Concrete Pumping:

  • Isolate the concrete truck and pump zone with fencing or other barriers.
  • If working in the street, comply with local by-laws.
  • Check all individual components for wear and possible damage.
  • Check each vertical bend is fixed to stop movement of the bend.
  • Pumping equipment must be in a mechanically sound condition
Back  Buy Now $79.95 plus GST