Work Method Statements
  Construction
  Procedure Earth Moving
  Procedure Industrial
prcoedures
  Procedure Engineering
prcoedures
  Procedure Transport
prcoedures
  Procedure Food & Hospitality
prcoedures
  Procedure Landscaping & Gardening
prcoedures
  Procedure Office
prcoedures
  Procedure Mining
prcoedures
  Procedure Custom WMS

Concrete Preparation and Laying - Safe Work Method Statement

The seven page Safe Work Method Statement outlines the Safety Steps required to Prepare and Lay Concrete Safely.

Concrete Preparation and Laying needs to be approached with caution and appropiate Safe Work Method Statements. The Concrete Preparation and Laying Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.

The Safe Work Method Statement includes:

  • Risk Assessment
  • Personal Safety
  • Formwork And Reinforcing
  • Concrete Truck Safety
  • Finishing Concrete
  • Completion
  • Emergencies

Weed_Spray

Back  Buy Now $79.95 plus GST

Concrete Preparation and Laying Safety Notes

When Preparing and Laying Concrete:

  • Check the handle and blade of the shovel to ensure it is not broken or skewed.
  • Never overload the shovel.
  • Ensure safe access and exit on and off the site for the concrete truck.
  • When operating concrete, avoid contact with eyes and skin.
Back Buy Now$79.95 plus GST